期刊文献+

昆阳磷矿5、6采区台阶高度的确定 被引量:1

Determination of Bench Height in V and VI Working Areas of Kunyang Phosphate Mine
下载PDF
导出
摘要 台阶高度是采场要素中的一个重要参数,台阶高度确定的合理与否,直接影响设备的生产效率和采剥成本。随着矿山规模的增大,昆阳磷矿引进大型穿孔及铲装设备,高台阶采剥工艺将成为昆阳磷矿发展的必然趋势。根据昆阳磷矿5、6采区矿岩性质、爆破方式和穿孔及铲装设备的技术参数,采用计算法和类比法对5、6采区的台阶高度进行选取。得出昆阳磷矿5、6采区的台阶高度为15 m。 Bench height is one of the most important parameters in key elements of mining areaS, and whether its determination is reasonable or not, directly impacts production efficiency of equipment and stripping cost. With the increase of mining scale and introduction of large - size perforation and shovel loading equipment, the high bench stripping technology will become the inevitable trend of Kunyang Phosphate Mine' s development. Accord- ing to ore properties in V and VI working areas, blasting mode and technical parameters of perforation and shovel loading equipment, selection for bench height of V and VI working areas was carried out by using methods of cal- culation and analogy in result that bench height of V and VI working areas in Kunyang Phosphate Mine was deter- mined as 15 meter.
出处 《有色金属设计》 2013年第3期7-11,共5页 Nonferrous Metals Design
关键词 昆阳磷矿 露天采场 采区台阶高度 Kunyang Phosphate Mine open -pit mining bench height in working areas
  • 相关文献

参考文献5

二级参考文献7

共引文献40

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部