期刊文献+

预应力混凝土斜拉桥合拢段施工过程分析 被引量:4

Analysis on Construction Process of Closure Segment of Pre-stressed Concrete Cable-stayed Bridge
下载PDF
导出
摘要 结合双塔双索面矮塔斜拉桥工程实例,介绍了预应力混凝土斜拉桥合拢段的施工方案,阐述了桥梁混凝土施工技术控制要点,有关经验可供相关专业人员参考。 According to the engineering practices of the double-pylon double-plane low-pylon cable-stayed bridge, this paper introduces the construction scheme of closure segment of pre-stressed concrete cable-stayed bridge, and sets forth the control gist of concrete construction technology of bridge. The relative experience can be referred for the similar bridges.
作者 崔行航
出处 《城市道桥与防洪》 2014年第3期99-100,110,共3页 Urban Roads Bridges & Flood Control
关键词 预应力 混凝土斜拉桥 施工 技术控制 pre-stressed,concrete cable-stayed bridge,construction,technical control
  • 相关文献

参考文献2

  • 1范立础.桥梁工程[M].北京:人民交通出版社,2000.
  • 2Hyo-Gyoung Kwak,Young-Jae Seo.Shrinkage cracking at interior- support of continuous pre-cast pre-stvessed concrete girder bridge [J].construction and building materials,2002.

共引文献19

同被引文献23

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部