摘要
以某工程为实例,比较了组拼式钢模板、钢框胶合板模板和木梁塑料模板,选择木梁塑料模板体系,根据现场条件和构件特征,选择采用单侧支模和挂架爬模施工技术,介绍了模板选型、材料、工艺,并归纳了施工过程中需重点控制的几项关键技术。
Through comprehensive comparing three kinds of solutions (spellers type steel formwork, steel frame plywood formwork and wooden beam plastic template ) ,and according to the site conditions of a project and component characteristics, the technology of single erecting and pylons jumping wood formwork is chosen. Meanwhile, the formwork materials, construction technology are introduced, and the key technical control measures are summed up.
出处
《混凝土与水泥制品》
北大核心
2014年第5期77-79,共3页
China Concrete and Cement Products
基金
河南省科技厅软科学研究项目"城市拆迁中群体性突发事件发生机制的博弈分析"(112400450217)
河南省政府招标研究项目"河南县域房地产业发展研究"(2013B002)
关键词
清水混凝土
圆弧墙体
单侧支模
挂架爬升
Architectural concrete
Arc wall
Single erecting formwork
Pylons jumping