摘要
张石高速石家庄段公路工程近20 km的路基靠近山皮土地区,通过试验、施工、总结,完善了路基填筑山皮土施工工艺,并进行了推广使用。文章从施工前的准备工作、施工方法及检测等方面详尽介绍了路基填筑山皮土施工的全过程。
About 20 km roadbed of Shijiazhuang section of ZhangShi Highway close to hill - skill soil area. Through test, construction and summary, perfected the hill -skill soil construction technology of subgrade filling, and promote the use. This paper introduced the construction process of subgrade filling hill - skill soil from the aspects of preparation work before construction, construction methods and testing.
出处
《内蒙古公路与运输》
2014年第2期24-25,共2页
Highways & Transportation in Inner Mongolia
关键词
高速公路
路基
山皮土
施工工艺
highway
subgrade
hill - skill soil
construction technology