摘要
本文主要论述了具有可浮动双鸽尾筋及穿心螺杆结构的定子铁心工地施工新工艺、定位基准的确定、工艺参数的合理选择以及提高铁心质量的措施等。
It was described that the new technology of assembly on site of stator core wit h f loating double dovetail key and middle clamping bolt,and the determination of lo cate base,the reasonable choice about technique parameter and the measurement of improving core quality were given in this paper.
出处
《大电机技术》
北大核心
2001年第2期33-36,共4页
Large Electric Machine and Hydraulic Turbine