邯矿集团陶一矿回收保护煤柱,但受原固定性支承压力和工作面超前支承压力的双重影响,采面过下山的临近区域煤体十分容易破碎,引起倾斜长壁仰斜开采面出现片塌与漏顶。针对上述问题,采用充填法,通过对充填材料和充填工艺的研究,解决回收煤柱的问题。
Handan Mining Industry Group, Taoyi Mine recycled protection coal pillar, but influenced by the original solid bearing pressure and working face advanced support pressure, mining area crossing downhill nearby, coal body was prone to smash to pieces, caused inclined long-wall inclined mining face piece of collapse and leaking roof. Based on the problem above, filling mining was adopted, through packing material and filling technology research to solve the recovery of coal pillar problem.
出处
《煤炭与化工》
CAS
2014年第3期97-99,共3页
Coal and Chemical Industry
关键词
煤柱回收
充填法
充填材料
充填工艺
coal pillar recovery
filling method
packing materials
filling process