唐山港曹妃甸港区煤码头二期工程装卸工艺设计回顾 被引量:1

Handling Process Design of Coal Terminal Phase-2 Project of Caofeidian Harbor at Tangshan Port
下载PDF
导出
摘要 目前专业化煤炭装船码头的装卸工艺系统尽管有很成熟的工艺布置方案和设备选型经验,但随着工艺设备技术水平的提升、节能减排和环保条件的日益严格要求,装卸工艺系统也需要与时俱进并大胆创新。本文就曹妃甸港煤码头二期工程,对专业化煤炭装船码头的工艺设计进行了总结和回顾。 At present,the handling system of specialized coal-loading terminal is of mature layout plan which is supported by rich experiences of equipment selection. However,coal handling system also needs to be advanced with the times and innovated boldly in order to meet the increasingly strict requirements for technology updating of handling equipment,energy-saving,emission-reduction and environmental protection. The handling process design of specialized coal-loading terminals is reviewed and summarized on the basis of coal terminal phase-2 project of Caofeidian Harbor at Tangshan Port.
出处 《港工技术》 2014年第1期7-10,共4页 Port Engineering Technology
关键词 翻车机 变频驱动 活化给料机 多工位伸缩头 条形仓 car dumper variable-frequency drive sub-resonance feeder telescoping conveyer head stacker-reclaimer cover shed
  • 相关文献

参考文献2

  • 1中交第一航务工程勘察设计院有限公司,唐山港曹妃甸港区煤码头(二期)32程[R].天津,中交第一航务工程勘察设计院有限公司,2009.
  • 2JTJ211-99海港总平面设计规范[S].北京:人民交通出版社.1999.

共引文献17

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部