摘要
以矮塔斜拉桥为工程背景,考虑矮塔斜拉桥在施工过程中的体系转换与非线性效应的影响,采用桥梁专用计算软件MIDAS/CIVIL对矮塔斜拉桥施工过程进行模拟分析,分析了矮塔斜拉桥在恒载作用下,双非线性对桥梁挠度、内力及应力影响,提出了有益建议,可为同类桥梁的设计与施工控制提供一定的参考。
Taking the short tower cable-stayed bridge for the enginering background,Considering the influence of system transformation and the nonlinear effect of the short tower cable-stayed bridge in the construction process,Using the special bridge calculation software MIDAS/CIVIL simulation the con-struction process of the short tower cable-stayed bridge.Analysis of the short tower cable-stayed bridge under dead load,double nonlinear influence on the deflection,internal force and stress.Put forward the useful suggestions,may provide some references for design and construction of the Similar bridge.
出处
《公路工程》
北大核心
2014年第2期205-206,226,共3页
Highway Engineering
关键词
矮塔斜拉桥
几何非线性
材料非线性
施工过程
short tower cable-stayed bridge
geometrical non-linearity
material non-linearity
construction process