摘要
介绍朔黄线严把"道岔初装关、工电整治关、维修技巧关",提高ZYJ7外锁闭道岔运用质量的做法,希望对类似工程提供借鉴。
The paper introduces hot to guaranty the qualities from switch installation, electric engineering renovation and maintenance skills to improve the application quality of ZYJ7 external locking switch, which is hopefully providing reference for similar projects.
出处
《铁路通信信号工程技术》
2014年第2期65-67,共3页
Railway Signalling & Communication Engineering
关键词
运用质量提高
ZYJ7外锁闭道岔
朔黄线
improvement of application quality
ZYJ7 external locking switch
Shuohuang railway line