摘要 塔里木盆地顺9井区碎屑岩储层埋藏深,为特低孔、特低渗储层,岩性致密,渗透性极差,直井压裂投产后表现为供液不足、单井稳产能力差、产能低、采收率低、勘探开发成本高、经济效益相对较差;该井区通过水平井分段加砂压裂储层改造后,单井产能有明显提高。但常规压裂分段方案不能有效地优化产能与经济的关系,为此引进统一压裂设计(UFD)计算方法以有效地解决这个问题,通过油藏分析计算得出地层渗透率及地应力,运用P3D软件进行计算,得出无量纲裂缝导流能力CfD和无量纲生产指数JD;同时考虑不同改造规模下的生产能力,以最优生产指数为目标优化裂缝几何尺寸,要求针对最佳的裂缝几何尺寸进行优化压裂施工设计;在评价期内对产能进行预测,结合投入成本进行经济评价,与泵注程序相结合,最终得出设计优化结果。 The clastic reservoir in Wellblock Shun 9of Tarim Basin was buried deeply,it belonged to the reservoir with extra-low porosity and low permeability,its lithology was dense and permeability was very poor.The conventional vertical well perforating operation has been unable to get capacity.The fractures from acid fracturing formed preferable fluid channel,While can acquire a certain capacity,But the lesser of the area and radius of vertical well oil drain,And the poor permeability.Production after fracturing in straight wells presented that liquid supply was insufficient,the capacity of single well production stability was poor with low productivity and low oil recovery,production cost was high and economic efficiency was relatively low.Through reconstruction of staged sand fracturing in horizontal well,the capacity of single well increased obviously.The conventional staged fracturing program could not effectively optimize the relationship between productivity and economy,a method of unified fracturing design(UFD)was introduced to effectively solve the problem,formation permeability and in-situ stress obtained by reservoir analysis were calculated by using P3D software,the dimensionless fracture conductivity Cfd,Dimensionless production index JD were derived,at the same time,the production ability under different reconstructing scales was taken into consideration,the geometric size of fractures were optimized based on the optimal production index,and it was required that the optimal fracturing geometric size should be optimized,the productivity was predicted in the evaluation period.Economic evaluation is given in combination with production cost,and combined with pumping procedure,optimized result is obtained ultimately.
出处 《石油天然气学报》 CAS CSCD 2014年第3期110-116,8,共7页 Journal of Oil and Gas Technology
关键词 塔里木盆地 碎屑岩 统一压裂设计(UFD)技术 产能评价 Tarim Basin clastic rock UFD method productivity evaluation
  • 相关文献

参考文献10

  • 1陈作,王振铎,曾华国.水平井分段压裂工艺技术现状及展望[J].天然气工业,2007,27(9):78-80. 被引量:175
  • 2黄延章.低渗透油层非线性渗流特征[J].特种油气藏,1997,4(1):9-14. 被引量:183
  • 3American Petroleum Institute. Recommended practices for evaluating short term proppant pack conductivity [J] . APIRP 61, 1989, 9 (4): 198-205,.
  • 4刘振宇,刘洋,贺丽艳,翟云芳.人工压裂水平井研究综述[J].大庆石油学院学报,2002,26(4):96-99. 被引量:60
  • 5Valko P P, Amini S. The method of distributed volumetric sources for calculating the transient and pseudosteady-state productivity of complex well-fracture configurations [J] . SPE106279, 2007.
  • 6Valko P P, Economides M J. Heavy crude production from shallow formations: Long horizontal wells versus horizontal fractures [J]. SPE50421 , 1998.
  • 7Economidedes MJ,Martin T.现代压裂技术-提高天然气产量的有效方法[M].卢拥军,等译.北京:石油工业出版社,2012.180-191.
  • 8孙庆和,何玺,李长禄.特低渗透储层微缝特征及对注水开发效果的影响[J].石油学报,2000,21(4):52-57. 被引量:65
  • 9Card R J, Howard P R, Feraud J P. A novel technology to control proppant back production production [J] . SPE31007, 1995.
  • 10Vincent M C, Pearson C M, Nullman J. Non Darcy and multiphase flow in propped {ractures: Case studies illustrate the dramatic effect on well productivity [J] . SPE54630, 1999.

二级参考文献25

  • 1郎兆新,张丽华,程林松.压裂水平井产能研究[J].石油大学学报(自然科学版),1994,18(2):43-46. 被引量:184
  • 2杨洪志,张瑞永,宋振云.塞平一井分段试油压裂工艺技术研究[J].石油钻采工艺,1996,18(2):52-57. 被引量:5
  • 3Liu X E, Liu S Q, Jiang Z X. Horizontal Well Technology in the Oilfield of China[J]. SPE 50424,1998.
  • 4Giger F M. Horizontal Wells Production Techniques in Heterogeneous Reservoirs[J]. SPE 13710,1985.
  • 5Giger F M. Low-Permeability Reservoirs Development Using Horizontal Wells[J]. SPE 16406,1987.
  • 6Brown J E, Economides M J. An Analysis of Hydraulically Fractured Horizontal Wells[J].SPE 24322,1992.
  • 7Mercer J C, Pratt III H R, Yost A B. Infill Drilling Using Horizontal Wells: A Field Development Strategy for Tight Fractured Formations[J]. SPE 17727,1988.
  • 8ElRafie E A, Wattenbarger R A . Comprehensive Evaluation of Horizontal Wells with Transverse Hydraulic Fractures in a Layered Multi-phase Reservoir[J]. SPE 35211,1996.
  • 9Horne R N. Relative Productivities and Pressure Transient Modeling of Horizontal Wells with Multiple Fractures[J]. SPE 29891,1995.
  • 10de Carvalho R S, Rosa A J. Transient Pressure Behavior for Horizontal Wells in Naturally Fractured Reservoir[J]. SPE 18302,1988.

共引文献465

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部