摘要
本文以锁儿头水电站调压井的施工任务为例,总结了内藏式调压井反导井开挖的施工技术及成功经验,对类似的工程具有指导意义。
Construction task of Suoertou Hydropower Station surge shaft is adopted as an example in the paper. Construction technology and successful experience of concealed surge shaft inverse pilot shaft excavation are summarized, which has guidance significance for similar projects.
出处
《中国水能及电气化》
2014年第4期1-5,49,共6页
China Water Power & Electrification
关键词
锁儿头水电站
调压井
反导井
开挖施工
Suoertou Hydropower Station
surge shaft
inverse pilot shaft
excavation construction