公格尔水电站引水隧洞按期、安全、保质、保量贯通,为整个电站工程首台机组投产发电奠定了基础。本文分析了公格尔水电站引水隧洞塌方产生的原因、处理方法、预防方法,可为类似引水隧洞塌方处理提供参考。
Kongur Hydropower Station water diversion tunnel is opened according to schedule safely with high quality and sufficient quantity, thereby laying foundation for the first unit production and power generation in the whole electric station. The causes, handling methods and preventive measures of Kongur hydropower station water diversion tunnel collapse are analyzed in the paper, thereby providing reference for collapse treatment in similar water diversion tunnels.
出处
《中国水能及电气化》
2014年第4期28-29,共2页
China Water Power & Electrification
关键词
公格尔水电站
引水隧洞
塌方处理
Kongur Hydropower Station
water diversion tunnel
collapse treatment