1Aehenbaeh PR,Treehsel HR.Evaluation ot eurrent guide lines of good Praetiee for condensation control in insulated building envelopes ,Thermal performance of the exterior envelopes of buildings. In 1I .Proeeedings of ASHRAE =DOE Conferenee, Las Vegas:ASHRAESP, 1982,1090-107.
4Butch D M.An analysis of moisture accumulation in walls subjected to hot and humid climates[J].ASHRAE Transactions,1993,99(2):1013-1022.
5Nancy J Holt,Nigei M Anderson.Ventilation of potrooms in aluminium production[J].TMS Light metals,1999:263-268.
6H M Kunzel.Simulation of indoor temperature and humidity conditions including hygrothermal interactions with the building envelope[J].Solar Energy,2005,78(4):554-561.
7Menghao Qin,Rafik Belarbi.Simulation of coupled heat and moisture transfer in air-conditioned buildings[J].Automation in Construction,2009,18(5):624-631.
8Daniel Aelenei,Fernando M A Henriques.Analysis of the condensation risk on exterior surface of building envelopes[J].Energy and Buildings,2008,40(10):1866-1871.