摘要
主要介绍了索塔施工过程中液压自爬模和下塔柱对撑的应用,有利于施工安全、质量和进度控制,形成了一套适用于同类型斜拉桥索塔施工的施工工艺。
This paper mainly introduces the application of hydraulic creep form and lower king - post strut diagonal brace in the course of construction. It favors the safety. quality and schedule control and it has formed a process of construction technique applied to similar cable tower.
关键词
斜拉桥
索塔
液压自爬模
下塔柱对撑
施工工艺
cable stayed bridge
cable support tower
hydraulic creep form
lower king - post strut diagonal brace
construction technique