摘要
以G217线沙雅-阿拉尔公路建设项目第二合同段K1203+300中桥为例,主要介绍了新疆风积沙地区钻孔灌注桩施工控制程序,施工注意事项及安全环保措施等。
In this paper, for the G217 line Shaya - Alar second contract section of the highway construction project K1203 + 300 bridge an example,it introduces the Xinjiang region of aeolian sand control procedures bored pile construction, construction and safety precautions and environmental protection measures.
关键词
风积沙
钻孔灌注桩
施工
安全环保
aeolian sand
bored pile
construction
safety and environmental protection