摘要 利用Shear Trac-Ⅲ大型直剪仪对松砂-混凝土接触面进行了常/变法向应力作用下的剪切试验,分析了剪切过程中剪应力和剪切面体应变的变化特征,建立了能够反映松砂-混凝土接触面剪切力学性状的数学模型,并给出了模型参数的确定方法。试验结果表明:在常法向应力作用下的剪切试验中,松砂-混凝土接触面的剪应力及体应变与法向应力密切相关;在变法向应力作用下的剪切试验中,松砂-混凝土接触面的抗剪强度与相应的常法向应力的抗剪强度相同,但其体应变小于相应的常法向应力作用下的体应变;在常法向应力作用下,松砂-混凝土接触面的剪应力-剪切位移关系可以用双曲线模型表示;在变法向应力作用下,松砂-混凝土接触面的剪应力-剪切位移关系可以用分段双曲线模型表示。 A series of shear tests of loose sand-concrete interface under constant/varying normal stress were carried out by using Shear Trac-Ⅲ large direct shear apparatus. The characteristics of shear stress and volumetric strain were analyzed, and some mathematical models were developed to reflect the shear mechanical properties of loose sand-concrete interface. In addition, the determine method of model parameters was provided. It is concluded that the shear strength and the volumetric strain of loose sand-concrete interface are closely related to the normal stress in the constant normal stress-shear tests. In the varying normal stress-shear tests, the shear strength is identical to that of the constant normal stress, but the volumetric strain is smaller. Based on the test data, the relationship between the shear stress and the shear displacement under the constant normal stress can be fitted with the hyperbolic curve; and the relation between them under the varying normal stress can be fitted with the piecewise hyperbolic curve.
出处 《建筑结构》 CSCD 北大核心 2014年第8期61-65,共5页 Building Structure
基金 国家自然科学基金(51078308)
关键词 常法向应力 变法向应力 松砂-混凝土接触面 剪切性状 大型剪切试验 数学模型 constant normal stress varying normal stress loose sand-concrete interface shear property large-scale sheartest mathematical model
  • 相关文献

参考文献9

  • 1殷宗泽,朱泓,许国华.土与结构材料接触面的变形及其数学模拟[J].岩土工程学报,1994,16(3):14-22. 被引量:393
  • 2王伟,卢廷浩,宰金珉,孙斌祥.土与混凝土接触面反向剪切单剪试验[J].岩土力学,2009,30(5):1303-1306. 被引量:46
  • 3YOSHIM1 Y, KISHIDA T. A ring torsion apparatus for evaluating friction between soil and metal surfaces [ J ]. Geoteehnical Testing Journal, 1981,4 ( 4 ) : 145-152.
  • 4UESUGI M, KISHIDA H. Influential factors of between steel and dry sands [ J ]. Soils and Foundations, 1986,26 (2) :33-46.
  • 5谢定义,陈存礼,胡再强. 试验土工学[M]. 北京:高等教育出版社,2011:360-376.
  • 6ALONSO E E, JOSA A, LEDESMA A. Negative skin friction on piles: a simplified analysis and prediction procedure[ J]. Geotechnique, 1984,34 ( 3 ) :341-357.
  • 7LEE C J, BOLTON M D, AL TABBAA A. Numerical modelling of group effects on the distribution of dragloads in pile foundations [ J ]. Geotechnique, 2002,52 ( 5 ) : 325 -335.
  • 8FELLENIUS B H. Results from long-term measurement in piles of drag load and downdrag [ J ]. Canadian Geotechnieal Journal ,2006,43 ( 4 ) :409-430.
  • 9HIRAYAMA H. Load-settlement analysis for bored piles using hyperbolic transfer functions [ J ]. Soils and Foundations, 1990,30( 1 ) :55-64.

二级参考文献7

共引文献435

同被引文献70

引证文献8

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部