摘要
分析了全球首套180万吨/年S Zorb新建装置物资供应环节存在的突出难点;从分级管理、质量控制、进度控制、风险识别与预防、问题化解等方面阐述了分级高效、质量为先的采购过程控制体系的主要内容;验证了该体系可为工程建设物资的安全、及时供应提供强有力的保障。
The article analyzes the main problems in the area of procurement for the world's first 180Mt/a S Zorb plant, elaborates the systematic procurement process control from the aspects of rating, quality control, progress control, risk identification and prevention as well as solution of problems and proves that this system can realize the safety and on time supply of materials.
出处
《当代石油石化》
CAS
2014年第2期16-20,共5页
Petroleum & Petrochemical Today
关键词
催化汽油
采购
分级
质量
进度
catalytic gasoline
procurement
rating
quality
progress