1S Chanas, A Kasperski. Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing time and fuzzy due dates [ J ]. Engineering Application of Artificial InteUigence, 2001,14 (3) :347 - 366.
2H Kim, S Park. A Strong cutting Plane algorithm for the robotic as- sembly line balancing problem [ J ]. International Journal of Pro- duction Research. 1995,33(87) : 2201 -2312.
3K Klamroth, M Wiecek. A time - dependent multiple criteria single -machine scheduling problem [ J ]. European Journal of Opera- tional Research ,2001,135 ( 1 ) : 13 - 28.
4M Ventresca, B M Ombuki. Meta - heuristics for the Job Shop Scheduling Problem [ R ]. Canada: Brock University, 2003,123 : 598 - 609.
5A Ingolfsson, M Haque, A Umnikov. Accounting fortime - varying queueing effects in work force scheduling[ J]. European Journal of Operational Research ,2002,139:539 - 589.
6Albert Corominas, Rafael Pastor,Joan Plans. Balanc in gassembly line with skilled and unskilled workers[J]. Omega,2008,36(6) : 1022 -1127.
7Bukchin J. Dar - E1 E. M. Rubinovitz J. Mixed model assemblyline design in amake - to - order environment[ J]. Computer & Indus- trial Engineering,2002,41 (4) : 398 -411.
9M A Youndt, S A Snell. Human Resource Configurations, Intellec- tual Capital, and Organizational Performance [ J ]. Journal of Man- agerial Issues ,2004, (3) :312 - 367.
10S M N Azaiez,S A1 Sharif,A 0 -1 goal programming model forn- urse scheduling[ J ]. Computers& Operations Research, 2005,32 (3) :472 -503.