期刊文献+

浅埋暗挖连拱隧道的衬砌结构数值分析 被引量:1

Numerical analysis of two arch tunnel with shallow-buried excavation
下载PDF
导出
摘要 以沿海某环岛路连拱隧道为依托,采用有限元数值模拟的分析方法,考虑隧道所处的特殊地质条件,模拟隧道开挖的施工全过程,得出了隧道与上部地面建筑物的竖向位移云图,以及隧道自身结构的主应力云图,计算结果表明,采取设计拟定的工程措施,可以保证隧道施工过程中地面建筑物与隧道自身的安全.同时,在隧道施工中,必须对隧道进行动态施工监测管理和安全隐患预报. Based on the two arch tunnel in coastal city , and combining the methods of finite element numerical simulation with the special geological conditions of tunnel , the whole process of the construction of tunnel excavation was simulated in this paper .The vertical dis-placement nephogram of tunnel and the upper part of the buildings on the ground was ob -tained involving the principal stress nephogram of tunnel structure .The calculation results showed that taking designed engineering measures could ensure safety of the buildings on the ground and the tunnel .During the construction , the need for dynamic monitoring of construc-tion management and safety hazard prediction of tunnel .
出处 《哈尔滨商业大学学报(自然科学版)》 CAS 2014年第2期215-219,共5页 Journal of Harbin University of Commerce:Natural Sciences Edition
基金 福建省教育厅项目(JA13218) 福建省高校专项基金项目(JK2011034) 福建工程学院科研发展基金项目(GY-Z10072)
关键词 浅埋暗挖 连拱隧道 位移云图 主应力云图 shallow-buried excavation two arch tunnel displacement nephogram principal stress nephogram
  • 相关文献

参考文献6

二级参考文献38

共引文献104

同被引文献12

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部