土压平衡盾构全断面硬岩施工技术 被引量:5

Construction Technology of Earth Pressure Balance Shield in the Whole Section Hard Rock Layer
下载PDF
导出
摘要 盾构隧道开挖断面范围为硬岩地层时,存在盾构掘进速度慢、盾构姿态控制难度大、设备及刀具磨损严重且刀具更换频繁等问题。结合实际工程,介绍了盾构选型、掘进模式选择、盾构掘进参数和盾构姿态控制、刀具管理等关键措施,确保盾构安全顺利推进。 There are some difficulties when tunnel section locating in weathered hard rock stratum such as slow tunneling speed, difficulties in controlling shield posture, equipment and serious tool wearing and frequent tools replacing. Based on actual project, key measures are introduced to ensure the safety and successful shield construction including choosing the reasonable selection of shield and driving mode, strictly controlling of shield tunneling parameters and shield posture, and strengthening shield tools management.
作者 闫建诚
出处 《施工技术》 CAS 北大核心 2014年第9期127-130,共4页 Construction Technology
关键词 隧道工程 盾构 全断面砂层 渣土改良 沉降 tunnels shields whole section sand layer soil amelioration settlement
  • 相关文献

参考文献6

  • 1杨秀仁.北京地铁盾构隧道设计施工要点[J].都市快轨交通,2004,17(6):32-37. 被引量:29
  • 2王良.盾构法施工在北京地铁5号线的应用[J].都市快轨交通,2004,17(5):33-37. 被引量:18
  • 3GB50446-2008盾构法隧道施工与验收规范[S].北京:中国建筑工业出版社,2008.
  • 4北京城建集团有限责任公司.GB50299—1999地下铁道工程施工及验收规范[S].2003版,北京:中国计划出版社,2004.
  • 5中国城市规划设计研究院.GB50490-2009城市轨道交通技术规范[S].北京:中国建筑工业出版社,2009.
  • 6山西建筑工程(集团)总公司.GB50208-2011地下防水工程质量验收规范[S].北京:中国建筑工业出版社,2001.

共引文献57

同被引文献24

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部