摘要
丰潭引水工程是嵊州市“八五”期间的重点水利工程 ,属跨行政区域 ,跨流域引水 .引水洞长 486 0m ,建设期采用的隧洞施工管理、施工技术。
Fengtan Diversion Project is an important water conservancy one of “Shengzhou's Eighth Five Year Plan”,which is trans regional and of trans valey.Diversion tunnel is 4,860 meters.Tunnel construction supervision,technology,and organization measurements are of some reference for construction progress.
出处
《浙江水利水电专科学校学报》
2000年第4期54-56,共3页
Journal of Zhejiang Water Conservancy and Hydropower College
关键词
隧洞施工管理
技术
进度
tunnel construction supervision
technology
construction progress