摘要
针对麒麟寺水电站工程在汶川"5.12"地震后出现的问题进行了分析总结,提出了相应的解决措施和方案。结合工程实际计算分析了方案的可行性、安全性。
Issues, occurred after the earthquake happened o May 12, 2008, on Qilingsi Hydropower Station are analyzed and summarized.Corresponding handling measures and schemes are raised.In combination with the actual works, feasibility and safety of these schemes are calculated and studied.