山口水电站工程混凝土拱坝施工组织关键技术 被引量:3

Key Technology of Concrete Arch Dam Construction,Shankou Hydropower Project
下载PDF
导出
摘要 山口水电站总库容为2.22亿m3,属大Ⅱ等(2)型工程,地处新疆严寒、干旱地区。挡水建筑物为常态混凝土双曲拱坝,最大坝高94 m。大坝采用全级配骨料,可行性研究阶段施工组织设计结合气候、导流度汛、四级配骨料、地形条件等因素针对导流过水围堰、全级配混凝土、大坝浇筑方式、温控等关键技术问题进行了研究。 Shankou Hydropower Project, with the total storage capacity of 2.22 million m^3 , Grade 2B in scale, is located in the extremely cold and dry region, Xinjiang Autonomous Region.The water-retaining structure is the conventional concrete double-curvature dam with maximum height of 94 m.The dam concrete totally applies the fully graded aggregates.At the feasibility study stage, the key technical issues such as overflow cofferdam for river diversion, fully graded-aggregate concrete, dam concrete placement means and temperature control, etc are studied in the construction method statement in combination with local climate, river diversion, flood control, four graded aggregates, landform conditions, etc.
作者 李江 王健
出处 《西北水电》 2014年第2期39-44,共6页 Northwest Hydropower
关键词 严寒 双曲拱坝 导流 过水围堰 全级配 骨料 混凝土浇筑 温度 控制 extremely cold double-curvature arch dam river diversion overflowing cofferdam full gradation aggregate concrete placement temperature control
  • 相关文献

参考文献2

  • 1DL/TT5397-2007,水电工程施工组织设计规范[S].北京:中国水利水电出版社,2008.
  • 2DL/TT5346-2006,混凝土拱坝设计规范[S].北京:中国水利水电出版社,2007.