嗣后充填法矿柱稳定性分析 被引量:3

Analysis on Ore Pillar Stability for Backfill Mining
下载PDF
导出
摘要 以罗河铁矿为工程实例,采用力学理论与正交敏感性极差分析相结合的方法,对影响矿柱稳定性因素进行了敏感性极差分析,得出了矿柱矿房宽度对矿柱稳定性影响最大,上覆岩层高度、抗压强度及矿柱高度次之,随后运用数学回归分析法,对影响矿柱稳定性的不同因素进行了线性回归,并对回归系数进行了MATLAB残差验证分析,得出了不同因素综合作用下的矿柱稳定性数学预测模型,定量分析了不同条件下的矿柱稳定性,最后分析得出了罗河铁矿嗣后充填回采的矿柱安全宽度为17m左右。 Taking Luohe iron mine as an example, the affecting factors of pillar stability were analyzed with the methods of me- chanical theory and orthogonal sensitivity analysis. It obtained that the width of pillar and stope was the main factor for pillar stability, then overburden rock height, compressive strength and pillar height follows. The linear regression of the factors was conducted, as well MATLAB residuals verification analysis for the regression coefficients. As a result, we got the mathematical prediction model of pillar stability under the comprehensive effect from different affecting factors. Quantitative analysis of pillar stability was carried out in differ- ent conditions. It concluded that the pillar safety width was about 17m for subsequent filling in Luohe iron mine.
出处 《铜业工程》 CAS 2014年第2期32-35,共4页 Copper Engineering
基金 国家自然科学基金(51274023)
关键词 嗣后充填 矿柱宽度 稳定性 敏感性 正交极差 线性回归 backfilling pillar thickness stability sensitivity orthogonal polar difference
  • 相关文献

参考文献6

二级参考文献50

共引文献115

同被引文献22

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部