期刊文献+

大采高综采工作面护巷煤柱尺寸研究 被引量:1

Study on Chain Pillar Dimension of Fully-mechanized Mining Face with Large Mining-height
下载PDF
导出
摘要 以晋煤集团寺河矿西井区W1301综采工作面回采为背景,采用数值模拟和现场监测的方法对工作面侧向护巷煤柱的合理宽度进行了分析。数值模拟结果表明,当煤柱宽度为25~30 m时,能够有效保持巷道围岩的稳定性。现场监测结果表明,工作面侧向支承压力的影响范围约为27 m,验证了现场工作面护巷煤柱宽度为30 m的合理性。 Taking the mining of W1301 fully-mechanized working face in the western of Sihe Coal Mine as background,analyzed the rational width of chain pillar by numberical simulation and field observation. Numberical simulation results show that,it can guarantee the stabilization of roadway surrounding rock when the width of chain pillar is 25 ~ 30 m. Field observation results show that,the influenced range of horizontal abutment pressure is about 27 m. The numberical simulation results verified the rationality of the field chain pillar width 30 m.
作者 王俊杰
机构地区 晋城煤业集团
出处 《中州煤炭》 2014年第4期4-6,共3页 Zhongzhou Coal
关键词 数值模拟 现场监测 护巷煤柱 numberical simulation field observation chain pillar
  • 相关文献

参考文献8

二级参考文献42

共引文献263

同被引文献2

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部