摘要
哈郑黄河大跨越工程使用JLHA1/G4A-900/240-42/37特强钢芯高强度铝合金绞线,导线技术要求高,加工难度大,监造单位针对此特点就原材料入厂、半成品加工及检验、成品绞制及检验等全过程进行见证与监督,保障了导线产品质量。
The JLHA1/G4A-900/240-42/37 high-strength steel core aluminum alloy stranded wires used in the Hami-Zhengzhou UHV DC Cross Yellow River Transmission Project are technically de-manding and diffcult to process. Manufacturing supervision provider witnessed and supervised the whole process including:inbound raw material, semi-ifnished products processing and inspection, ifnished products stranding and inspection to assure the quality of wire products.
出处
《设备监理》
2014年第3期35-38,共4页
Plant Engineering Consultants
关键词
哈郑工程
导线
监造
质量控制
Hami-zhengzhou Project
wires
manufacturing supervision
quality assurance