期刊文献+

我国工程项目供应链管理发展历程与特点 被引量:1

Characteristics and Development Process of Supply Chain Management of Engineering Project in China
下载PDF
导出
摘要 随着改革开放的不断深入,我国工程建设管理模式从学习先进走向自主创新。近年来在我国工程企业的不懈努力下,管理模式日新月异,已经成功实践了EPC、PMC(Project Management Contract)、IPMT(Integrated Project Management Team)和供应链管理等项目管理模式。本文对我国工程项目供应链管理发展过程进行了梳理,并对工程供应链特点进行简述。 With the deepening of reform and open in China, the construction management mode has promoted from learning advanced to self-dependent innovation. In recent years, under the tireless efforts of Chinese engineering enterprises, the management mode is improving continuously, and has successfully practiced many management modes such as EPC, PMC (Project Management Contract), IPMT (Integrated Project Management Team) as well as supply chain management. This paper summarizes the development process of engineering project supply chain management in our country, and gives a brief description of the characteristics of construction supply chain.
出处 《价值工程》 2014年第16期31-33,共3页 Value Engineering
基金 四川大学中央高校基本科研业务费研究专项项目(skqy201349)资助
关键词 工程项目 供应链 管理 模式 engineering project supply chain management mode
  • 相关文献

参考文献1

  • 1先光,李启明,汪文雄.建设工程项目中的供应链管理应用研究[C].全国管理科学与工程博士生学术论坛,2007.

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部