摘要
本文研究了生产建设项目水土保持设施竣工验收的程序和方法,对于在实践中做好生产建设项目水土保持设施竣工验收工作具有重要的意义。
This paper studies completion and acceptance of soil and water conservation facilities in production and construction projects, which has an important significance for well completion acceptance of soil and water conservation facilities of construction projects in practice.
出处
《价值工程》
2014年第16期93-94,共2页
Value Engineering
关键词
生产建设项目
水土保持设施
竣工验收
production and construction projects
soil and water conservation facilities
completion and acceptance