深圳地铁11号线车公庙枢纽高强度岩层中型钢立柱施工关键技术

Case Study on Installation of Shaped Steel Columns in High-strength Rocks in Construction of Chegongmiao Station of Line 11 of Shenzhen Metro
下载PDF
导出
摘要 以深圳地铁11号线BT项目11301标车公庙枢纽工程为实例背景,介绍在高强度岩层(单轴抗压强度120 MPa)中快速实施型钢柱安装定位的两项关键技术。其一,通过引进先进的钻岩取芯设备及采用特殊的取芯工艺,确保在高强度岩层中大直径(2.0 m)的钻孔灌注桩快速成孔(一次进尺1.5~2.0 m);其二,在传统的十字型钢柱安装定位方法(即“先插法”)的基础上,提出全新的优化方案(即“后插法”),提高了工艺时效性,从而达到快速实施的目标。 In the construction of Chegongmiao Station of 1 1301 bid section of Line 1 1 of Shenzhen Metro,shaped steel columns need to be installed rapidly and accurately into high-strength rocks (with 120 MPa uni-axial compressive strength). The following two key technologies are adopted to fulfill the difficult job:1 )Advanced core-taking drilling rig is used and special core taking process is adopted so that large diameter (with 2.0 m diameter)boreholes can be drilled rapidly in the high-strength rocks (with 1.5 ~2.0 m cyclic drilling rate);2)The method of installing the cross-shaped steel columns after concrete casting is used so that the shaped steel columns can be installed rapidly and accurately. In the end,the job has been fulfilled successfully.
作者 陈瑜 李海龙
出处 《隧道建设》 2014年第4期362-367,共6页 Tunnel Construction
关键词 地铁枢纽 高强度岩层 快速成孔 十字型钢柱 先插法 后插法 精确定位 Metro station high-strength rock rapid borehole drilling cross-shaped steel column method of installing steel columns before concrete casting method of installing steel columns after concrete casting accurate positioning
  • 相关文献

参考文献8

二级参考文献4

  • 1JGJ138-2001.型钢混凝土组合结构技术规程[S].[S].,..
  • 2JGJ81-2002.建筑钢结构焊接技术规程[s].[S].,..
  • 3ZJQ00-SG-005-2003,钢结构工程施工工艺标准[S].
  • 4中华人民共和国建设部.GB50205—2002,钢结构工程施工质量及验收规范[s].

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部