摘要
以深圳地铁11号线BT项目11301标车公庙枢纽工程为实例背景,介绍在高强度岩层(单轴抗压强度120 MPa)中快速实施型钢柱安装定位的两项关键技术。其一,通过引进先进的钻岩取芯设备及采用特殊的取芯工艺,确保在高强度岩层中大直径(2.0 m)的钻孔灌注桩快速成孔(一次进尺1.5~2.0 m);其二,在传统的十字型钢柱安装定位方法(即“先插法”)的基础上,提出全新的优化方案(即“后插法”),提高了工艺时效性,从而达到快速实施的目标。
In the construction of Chegongmiao Station of 1 1301 bid section of Line 1 1 of Shenzhen Metro,shaped steel columns need to be installed rapidly and accurately into high-strength rocks (with 120 MPa uni-axial compressive strength). The following two key technologies are adopted to fulfill the difficult job:1 )Advanced core-taking drilling rig is used and special core taking process is adopted so that large diameter (with 2.0 m diameter)boreholes can be drilled rapidly in the high-strength rocks (with 1.5 ~2.0 m cyclic drilling rate);2)The method of installing the cross-shaped steel columns after concrete casting is used so that the shaped steel columns can be installed rapidly and accurately. In the end,the job has been fulfilled successfully.
出处
《隧道建设》
2014年第4期362-367,共6页
Tunnel Construction
关键词
地铁枢纽
高强度岩层
快速成孔
十字型钢柱
先插法
后插法
精确定位
Metro station
high-strength rock
rapid borehole drilling
cross-shaped steel column
method of installing steel columns before concrete casting
method of installing steel columns after concrete casting
accurate positioning