期刊文献+

关键链多项目管理研究

Multi-project management based on critical chain
下载PDF
导出
摘要 为解决多项目关键链管理问题对企业整体利益的影响,以多项目中各子项目工期总和的最小化为目标,提出"子关键链群"的概念。在单项目关键链管理的基础上,对项目间冲突资源的优先分配进行了分析研究,建立一套系统的分配规则,使得各子项目工期总和达到最小。同时,通过对项目间优先权的合理分配得出企业整体利益最大化的组合方案,实例验证,此方法可行、合理。 In order to resolve the critical chain project management issues which affect the overall in- terests of the enterprises, this paper puts forward the concept of sub critical chain group. This concept minimizes sub project sum as the goal in the multi project. Based on single critical chain project man- agement, the conflicts in priority allocation of resources projects were analyzed, and the distribution rules which limit the time for a project to reach the minimum value. At the same time, draw a combi- nation scheme which maximizes the overall interests of the enterprise through the rational allocation of project priorities, and this scheme is verified by practical examples.
出处 《河北工程大学学报(自然科学版)》 CAS 2014年第1期106-109,共4页 Journal of Hebei University of Engineering:Natural Science Edition
关键词 多项目管理 关键链 优先权 子关键链群 muhi project management critical chain priority sub critical chain group
  • 相关文献

参考文献7

二级参考文献38

  • 1杨雪松,胡昊.基于关键链方法的多项目管理[J].工业工程与管理,2005,10(2):48-52. 被引量:63
  • 2刘士新,宋健海,唐加福.基于关键链的资源受限项目调度新方法[J].自动化学报,2006,32(1):60-66. 被引量:63
  • 3李万庆,周冲,孟文清.未确知数学在建筑施工安全性评价中的应用[J].河北建筑科技学院学报,2006,23(2):83-85. 被引量:6
  • 4刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:70
  • 5COLDRATT E M. Critical Chain [ M ]. New York : The North River Press, 1997.
  • 6STEYN H. Project management applications of the theory of constraints beyond critical chain scheduling [ J]. International Journal of Project Management, 2002 (20) : 75 -80.
  • 7HERMAN STEYN. An investigation into the fundamentals of critical chain project scheduling [ J ]. International Journal of Project Management, 2000, 19 (6): 363-369.
  • 8WEI Chiu - Chi, LIU Ping - Hung, TSAI Ying - Chin. Resource - constrained project management using enhanced theory of constraints [ J ]. International Journal Of Project Management, 2002 ( 20 ) : 561 - 567.
  • 9RABBANI M, FATEMI GHOMI SMT, JOLAI F, etal. Huristic for resource- constrained project scheduling in stochastic networks using critical chain concept [ J ]. European Journal of Operational Re- search, 2007 (176) : 794 -808.
  • 10BENGEE LEE, JAMES MILLER. Multi- project management in software engineering using simulation modeling [ J]. Software Quality Journal, 2004 (12): 59-82.

共引文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部