摘要
通过对上海市漕廊公路次高压天然气管过沫沥港、秦湾路穿越工程案例进行分析,论述了在软硬分层地质中水平定向钻施工采取的相应改进措施,为以后定向钻穿越同类地质条件的工程提供了有益的借鉴。
By analyzing the engineering project which high-pressure natural gas pipelines cross Qingwan Road, the paper discusses the counter measures taken in the horizontally directional drilling construction under the soft-hard stratification geological condition, and can be as a good reference for the future engineering.
出处
《上海煤气》
2014年第2期30-31,35,共3页
Shanghai Gas
关键词
水平定向钻
软硬分层地质
风险控制
horizontally directional drilling
soft-hard stratification geology
risk control