摘要
以辽河生态文明示范路工程为背景,介绍了风积沙的工程技术特性及压实机理,对该工法的施工工艺流程、操作要点与施工注意事项进行了分析研究,并提出了质量控制措施,以确保工程的质量。
Taking the Liaohe ecological civilization demonstration road project as the background, this paper introduced the technical characteristics and compaction mechanism of drift-sand engineering, analyzed and researched the construction process, operation key points and matters needing attention to this engineering, and puts forward quality control measures, so as to ensure the engineering quality.
出处
《山西建筑》
2014年第16期161-162,共2页
Shanxi Architecture
关键词
风积沙
路基
填料
施工
drift-sand, sub-grade, filler, construction