谈半明半暗隧道进洞施工技术 被引量:1

Introduction to half bright and half dark tunnel construction technology
下载PDF
导出
摘要 以十白高速SHTJ-5标堵河隧道为工程背景,由于其左线出口地质条件差,因此洞口进洞设计为半明半暗开挖,为了顺利进洞,采用了洞顶截水沟、边仰坡开挖、支护,结合偏压挡墙施工、套拱、管棚施工以及洞顶回填土等关键施工工艺,结果表明采用该施工工艺取得了理想效果。 With the Shi-Bai high-speed SHTJ-5 standard Duhe tunnel as the engineering background, because of the geological condition of ex- port in left line is so poor, so the hole was designed for half bright and half dark excavation. In order to smoothly into the hole, the key construction technology of intercepting ditch roof, scope of slope excavation, supporting, bias retaining wall construction, the set of arch, the pipe roof construction and backfill roof were adopted. Results show that using this construction technology has obtained the ideal effect.
出处 《山西建筑》 2014年第16期193-194,共2页 Shanxi Architecture
关键词 半明半暗隧道 偏压 进洞 施工工艺 half bright and half dark tunnel, unsymmetrial loading, into the hole, construction technology
  • 相关文献

参考文献5

二级参考文献25

共引文献76

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部