摘要
结合铁四院总部设计大楼桩基工程超长桩的施工实例,对超长桩施工过程中存在的问题进行了分析,并提出了有针对性的处理措施,解决了超长桩施工技术中的质量控制难题,为今后超长桩的施工提供了参考借鉴。
Combining with the construction practice of pile foundation engineering super long pile of China Railway 4th Group Headquarters design building, analyzed the existing problems in super long pile construction process, and put forward some corresponding treatment measures, solved the quality control problems in super long pile construction technology, provided reference for future super long pile construction.
出处
《山西建筑》
2014年第15期85-86,共2页
Shanxi Architecture
关键词
超长桩
施工技术
处理措施
super long pile, construction technology, treatment measure