摘要
以某桥梁工程为例,从施工技术准备工作、拼装施工、施工工期等方面介绍了移动模架的拼装技术,并对移动模架的过孔施工工艺流程进行了详细论述,为移动模架施工积累了经验。
Taking the bridge engineering as an example, the paper introduces movable template assembly technology from aspects of construction technology preparation, assembly construction and construction schedule, and discusses the movable template via role construction procedures, which has accumulated experience for movable template construction.
出处
《山西建筑》
2014年第15期183-184,共2页
Shanxi Architecture
关键词
移动模架
拼装
过孔
步骤
movable template, assembly, via hole, step