摘要
针对上海地区深基坑工程施工过程中围护结构与周边环境变形量控制难度较大这一现象,从质量监督管理的角度,结合自身经验提出预防变形过大的对策,从而降低施工风险。
For the deformation control difficulties of building envelop and surrounding environment during deep pit construction in Shanghai, proposed the measures of preventing large deformation phenomenon from quality supervision and self experienment so as to reduce the construction risk.
出处
《工程质量》
2014年第5期1-4,共4页
Construction Quality
关键词
深基坑
变形
控制
对策
Deep foundation pit
Deformation, control
countermeasure