摘要
为了提高无缝线路铺设质量,在实际施工过程中,常用换铺法进行线路铺设。结合实际工程,对采用换铺法进行无缝线路锁定施工的相关工艺进行分析,以期能够为无缝线路铺设提供技术参考。
In order to improve the quality of CWR laying in the actual construction process, commonly used method for laying the line laying. Combined with the actual project, carried out for laying on the use of CWR construction related processes are analyzed in order to provide technical reference for the laying of CWR.
出处
《科技与创新》
2014年第6期14-14,共1页
Science and Technology & Innovation