6AMIN Amin, SAAD Bargach, JIM Donegan, et al. Building a knowledge-sharing culture [ J ] . Oilfield Review, 2001, 13 ( 1 ): 48-65.
7LESTER Bayne, CARACAS, PAOLO Censi, et al. Lifelong asset management using the web [ J ]. Oilfield Review, 2001, 13(4): 42-57.
8PATRICK Hooyman, RICHARD Plumb, DANIEL Bordelon. Minimizing drilling surprises in deepwater goal of ‘live' drilling plan [ J ]. Offshore, 2001.10, 61(10).
9RICHARD Plumb, STEPHEN Edward, GARY Pidcock, et al. The mechanical earth concept and its application to highrisk well construction projects [ R ] . IADC/SPE 59 128, American, 2000.
4Anwar Husen Akbar All, Brow n T , Delgado R, et al. Watching rocks change - mechanical earth modeling[ J]. Oilfield Review, 2003, 15(2) : 22- 39.
5Tom Bratton, Mark Fredette, Li Qiming, et al. Real- time LWD: logging for drilling [ J ]. Oilfield Review, 2000, 12(3): 58-78.
6Tortes M E, Frydman M, Casalis D, et al. 3D Analysis for wellbore stability: reducing drilling risks in Oriente Basin, Ecuador[J]. SPE 94758, American, 2005.