摘要
温泉水电站工程总体布置较好地结合了工程区的水文、气象、地形地质条件,拦河坝采用混凝土面板堆石坝,有效利用当地材料筑坝。利用河湾凸岸(右岸)布置泄洪和发电引水系统,布置紧凑,洞室长度短。通过工程的初步运行,情况良好,各项指标均达到设计要求。文章介绍了总体布置形式。
The overall layout of Wenquan hydropower station is suitable for the hydrological ,meteorological, topographic and geological conditions in the project area. The dam type is the concrete-faced rock fill dam (CFRD) and using local material for constructing dam. The convex band of river is used as arranging of flood discharge and diversion power generation system, so the layout is compact, and get short tunnel. The exploratory application of this project showed all kinds of specifications meet the requirement of design.
出处
《黑龙江水利科技》
2014年第1期39-41,共3页
Heilongjiang Hydraulic Science and Technology
关键词
工程总体布置
混凝土面板堆石坝
泄洪系统
引水发电系统
温泉水电站
project overall layout, concrete-faced rockfill dam (CFRD), flood discharge structure, diversion power generation system