摘要 红毛洞电站装机2×10MW工程指标相对并不优,因此设计时要尽量优化减少投资是非常必要的。为此,根据水轮机选择原则并结合目前水轮机的发展情况,对红毛洞电站进行优化选择设计。如通过机型选择比较,推荐HLA551C-LJ-172机型,根据水轮机计算的有关参数,选定2台10 MW悬式水轮发电机等。 Hongmaodong hydropower station has installed plant 2 × 10MW,its engineering index relative are not excellent,therefore it is necessary to optimize the design so as to reduce the investment. Based on the principles for turbine selection and combined with turbine development situation,optimum design is conducted for Hongmaodong hydropower station. For example through type selection,HLA551C-LJ-172 models are recommended; according to the turbine parameters calculation,210 MW suspension hydraulic generator is selected etc.
作者 唐仕红
出处 《黑龙江水利科技》 2014年第2期39-41,共3页 Heilongjiang Hydraulic Science and Technology
关键词 水轮机 模型综合特性曲线 运转特性曲线 调保计算 优选设计 turbine model synthetic characteristic curve operating characteristic curve regulation guarantee calculation
  • 相关文献

参考文献2

  • 1季盛林,刘国柱.水轮机[M].北京:水利电力出版社,1980.
  • 2《中国水力发电工程》编审委员会.中国水力发电工程机电卷[M].北京:中国电力出版社,2000.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部