通过对姚桥煤矿7521工作面过7517放水巷的分析,探讨了采煤工作面过老峒子的技术,在实践中取得了较好安全效益。
By analysis of crossing 7517 dewatering roadway at 7521 working face in Yaoqiao Colliery, the author probes into the technology of crossing chamber at mining face, which has achieved safety benefits in practice.
出处
《江西煤炭科技》
2014年第2期42-43,共2页
Jiangxi Coal Science & Technology
关键词
老峒子
层位
顶板
防灭火
old chamber
layer
roof
fire prevention and extinguishing