摘要
针对捣固焦炉生产间隙时间短、拦焦车推焦杆在线检修困难、影响生产时间长的问题,设计制作了一套检修架,优化了检修方案,缩短了检修时间,减少了对生产的影响.
The stamp-charging coke oven has the problem of short production interval, and it is difficult to make online maintenance for the coke pusher shoe, which influence the production time. For Solving these problems, optimize the maintenance scheme, and shorten maintenance time to reduce the influences on production.
出处
《冶金设备管理与维修》
2014年第2期11-13,共3页
Metallurgical Equipment Management and Maintenance
关键词
推焦车推焦杆
检修架
优化措施
Coke pusher shoe, maintenance stand, optimizing measures