摘要
三维地震勘探山区项目野外施工往往比平原更加复杂,地表起伏较大的情况直接影响山区地震资料的采集难度和采集质量。通过对山西五阳三维地震勘探实际情况分析复杂山区野外项目现场实际施工经验分析,总结出一些针对复杂山区野外施工的特殊方法,可以有效的降低野外施工成本,提高野外施工效率和质量。
3 d seismic exploration in mountainous area project field construction was often more complex than plain, the surface fluctuation situation directly influenced the sampling difficulty and the quality of seismic data in mountain areas. Through Shanxi Wuyang 3 d analysis of complex mountainous seismic exploration actual situation field project actual construction experience analysis, some special methods for complex mountainous field construction were concluded, which can effectively reduce the field construction cost, improve the efficiency of field construction and quality.
出处
《煤炭与化工》
CAS
2014年第4期59-60,63,共3页
Coal and Chemical Industry
关键词
三维地震
复杂山区
野外施工
3 d seismic
complexmountainous area
field construction