目标导向的政府农田水利建设项目全生命周期风险识别 被引量:3

The Goal-directed and Life Cycle Integrated Risk Identification Method of the Irrigation and Water Conservancy Construction Project for Government
下载PDF
导出
摘要 针对政府农田水利建设项目的系统性、复杂性、动态性等特征,提出了以风险管理目标为导向、基于全生命周期理论的政府农田水利建设项目风险动态的识别方法,着重探究了该方法的内涵和实施路径,构建了农田水利建设项目风险管理目标体系,并以湖北省某小型农田水利建设项目为例,对农田水利项目实施过程中的风险因素进行了全面识别,给出了风险评价的指标体系。 Considering characteristics such as systematic, complexity and dynamic of the project for government irrigation and water conservancy construction, the Goal-directed and Life Cycle Integrated method of risk edification for the project was put forward. The connotation and the implementing path of the assay was emphatically explores. The system of farmland water conservancy construction project risk management goal was constructed. Taking small irrigation and water conservancy construction project in Hubei province as an example, a comprehensive identification of the risk factors in the process of farmland water conservancy project was conducted. Risk evaluation index system was established.
作者 王姣 郑家喜
出处 《湖北农业科学》 北大核心 2014年第2期492-496,共5页 Hubei Agricultural Sciences
基金 教育部人文社会科学研究规划基金项目(11YJA630210) 中南财经政法大学2013年度百篇优秀博士论文培育项目(2013YB0802)
关键词 政府农田水利建设项目 目标导向 全生命周期 风险识别 government irrigation and water conservancy construction projects goal orientation life cycle risk identification
  • 相关文献

参考文献4

二级参考文献16

共引文献94

同被引文献16

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部