摘要
在研究以往综放工作面排水系统的基础上,创新性地提出利用水箱代替积水坑进行中转抽水的想法,并通过各方案之间对比分析,得出水箱具有灵活性高、可重复使用、节省人工费和材料费等众多优点,为综放工作面大落差巷道排水系统研究提供了借鉴。
Based on the basis of the drainage system of full - mechanized caving mining face research,it innovative put forward the idea of using water tank to replace the water hole to transfer water,and through analysis and comparison between the various schemes,it is concluded that water tank has high flexibility,reusable,saves labor and materials costs and many other advantages,this study provides reference for large elevation roadway drainage system research on the fully mechanized face.
出处
《煤》
2014年第5期7-8,共2页
Coal
关键词
综放工作面
大落差巷道
中转抽水
fully mechanized caving face
large elevation difference roadway
transfer pump