2Shamir U.An analytic approach to scheduling pipe replacement[J].Journal of AWWA,1979,71(5):248-258.
3Walski T M.Economic analysis of water main breaks[J].Journal of AWWA,1982,74(3):140-147.
4Yamijala S,Guikema S,Brumbelow K.Statistical models for the analysis of water distribution system pipe break data[J].Reliability Engineering & System Safety,2009,94(2):282-293.
5Economou T,Kapelan Z,Bailey T.A zero-inflated Bayesian model for the prediction of water pipe bursts[C]//Water Distribution Systems Analysis 2008.South Africa,2008:724-734.
6Rogers P D,Grigg N S.Failure assessment model to prioritize pipe replacement in water utility asset management[C]//Water Distribution Systems Analysis Symposium 2006.Cincinnati,Ohio,USA,2006:1-17.
7Cox D R.Regression models and life tables[J].Journal of Royal Statistic Society,1972,34(B):187-220.
8Andreou S A,Marks D H,Clark R M.A new methodology for modeling break failure patterns in deteriorating water distribution systems:Theory[J].Advance in Water Resources,1987,10(1):2-10.
9Andreou S A,Marks D H,Clark R M.A new methodology for modeling break failure patterns in deteriorating water distribution systems:Applications[J].Advance in Water Resources,1987,10(1):11-20.