摘要
随着城市地铁建设的大范围铺开,地铁车站的给水排水施工的技术质量问题日益凸显,文章结合工程实际,按施工前准备、施工中的技术控制和竣工后的维护运营三大阶段,分析了地铁车站给水排水常见的安装问题和质量风险点,提出相应的对策和方法。
With the wide spread of city subway construction,technical and quality problems of water supply and drainage construction of metro station has become increasingly prominent,the Article in combination with the engineering practice,According to the three stages of preparation stage and construction stage and completion stage,Analysis of common subway station of water supply and drainage installation problems and quality risk,put forward some countermeasures and methods.
出处
《福建建筑》
2014年第5期110-112,共3页
Fujian Architecture & Construction
关键词
地铁
给排水
安装技术
探讨
Metro
Water supply and drainage
Installation technology
Study