摘要
综掘工艺中掘、支、运三大工序即掘锚一体化、支护合理化、装运机械化之间的优化配置,可以最大限度提高单进水平和劳动效率,改善安全环境和工程质量,降低巷道掘进成本。
The three processes of excavation,support,transport in the fully mechanized excavation,namely the optimization of integration of driving and bolting、rationalize supporting,and mechanization of shipment,which can maximize the single level and work efficiency,improve safety and engineering quality,reduce the cost of roadway driving.
出处
《山东煤炭科技》
2014年第4期40-40,42,共2页
Shandong Coal Science and Technology
关键词
快速掘进
综掘机械化
滞后锚帮
平行作业
二运皮带搭接溜子改进
rapid excavation fully mechanized excavation rid anchoring supports laggingto driving parallel
operation improvement