期刊文献+

普通列车和CRH_2型动车组制动力荷载分析 被引量:2

Argumentation about Braking Force of High-Speed CRH_2 Train and Common Train
下载PDF
导出
摘要 为研究CRH2型动车组制动力和普通重载列车制动力对桥梁结构的影响差异,依据动车组制动减速度特性曲线,计算整车制动力时程,为桥梁结构承受动车组制动力的动力分析研究打下基础。通过与重载列车制动力时程的对比,表明动车组整车制动力数值比重载列车制动力小很多,且停车前保持平稳,不具有普通重载列车的冲击特性。 For studying bridge’s influencing difference under braking force of high-speed CRH2train and common heavy train,according to braking deceleration characteristic curve of high-speed train,the whole vehicle braking force time-history was studied.Dynamic analysis was prepared for bridge under braking force of high-speed train.By contrast with braking force time-history of common heavy train,it indicates that the whole vehicle braking force of high-speed CRH2train is smaller than the braking force of heavy train.The braking force of high-speed CRH2doesn’t possess common heavy train’s impactive character, and keeps stably before stopping.
作者 陈丹华
出处 《交通科技与经济》 2014年第2期1-3,38,共4页 Technology & Economy in Areas of Communications
基金 国家自然科学基金资助项目(51368018) 江西省教育厅资助项目(GJJ13324)
关键词 高速列车 制动 重载列车 时程 high-speed train braking heavy train time-history
  • 相关文献

参考文献7

二级参考文献32

  • 1李宏年,冯东.铁路桥梁轨面制动力的动态研究[J].铁道学报,1994,16(3):112-117. 被引量:14
  • 2章日凯,王常青.桥梁荷载试验[J].交通标准化,2005,33(12):69-72. 被引量:44
  • 3雷俊卿,李宏年,冯东.铁路桥梁列车制动力的试验研究与计算分析[J].工程力学,2006,23(3):134-140. 被引量:24
  • 4.[A]..国外高速列车译文集(制动技术专集)(二)[C].北京:铁道部科学研究院机车车辆研究所,1996..
  • 5中华人民共和国铁道部.TB10621-2009高速铁路设计规范(试行)[S].北京:中国铁道出版社,2009.
  • 6松浦章夫.高速鈇道における车両と桥桁の动的举动に関する研究[C]//土木学会论文集,1976,258(12):35-47.
  • 7LADISLAV FRyBA. Vibration of Solids and Structures under Moving Loads [ M ]. London : Thomas Telford, 1999.
  • 8钮泽全.牵引计算学[M].北京:中国铁道出版社,1991..
  • 9铁道部工务局.铁路工务技术手册-轨道[M].北京:中国铁道出版社,1993..
  • 10中华人民共和国铁道部.《铁路桥涵设计规范》(TB 10002.1-99)[M].北京:中国铁道出版社,2000.

共引文献105

同被引文献5

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部