期刊文献+

对外短期科技人力资源合作开发项目效度问题研究

Effectiveness of the Short-term International Scientific and Technological Human Resources Cooperation Development Project
下载PDF
导出
摘要 对外短期科技人力资源合作开发项目是中国科技援外项目的主要形式之一。在总结近年来项目情况的基础上提出了该项目的效度模型,对447位参加培训的发展中国家学员进行抽样问卷调查,使用偏最小二乘法分析了项目有效性的影响因素。结果表明:项目效度与技术目标、教学安排、实践环节相关。承办机构能力是项目有效的前提,接待工作对效度具有重要的支撑作用。 Short-term scientific and technological human resources cooperation development project in China is one of the main forms of technological official aid projects, but it is still a lack of empirical research on the effectiveness of training. Based on the summary of of- ficial training programs of China in recent years. This paper proposes a new model used to evaluate the effectiveness of the project. In the modeling process, it makes a questionnaire by choosing 447 participants from developing countries. Partial least squares approach is used to carry out the analysis of influencing factors in this model. The results show that: The effectiveness and technical objectives, teaching arrangements and practical arrangements have a direct positive correlation; Contractors institutional capacity is the basis and prerequisite for achieving project effectiveness; Reception work plays an important supporting role on the effectiveness.
出处 《中国科技论坛》 CSSCI 北大核心 2014年第6期108-114,共7页 Forum on Science and Technology in China
基金 国家软科学研究计划项目"应对全球性问题中的科技影响力研究"(2012GXS6D151)
关键词 人力资源开发 科技援外 培训 效度模型 Science and technology management Human resources development Scientific and technical aid Training Validity model
  • 相关文献

参考文献18

  • 1Barry B. Hughesa, Peter D. Johnston. Sustainable futures:policies for global development [ J ]. Futures ,2005, (37) :813 -831.
  • 2科学技术部国际合作司.中国科学技术部国际科技合作网培训专题页面2006-2012年培训计划[EB/OL].访问网址:ht-tp://www.cistc.gov.cn.2012-12-20.
  • 3D. L. Kirkpatrick, J. D. Kirkpatrick. Evaluating Training Programs ( 3rd ed. ) [ M ]. San Francisco, CA: Berrett-Koehler Publish- ers. 2006.
  • 4范柏乃,阮连法.干部教育培训绩效的评估指标、影响因素及优化路径研究[M].杭州:浙江大学出版社,2012.
  • 5Earl D. Honeycutt Jr. , Kiran Karande, Ashraf Attia, Steven D. Maurer. An utility based framework for evaluating the financial impact of sales force training programs [ J ]. The Journal of Personal Selling and Sales Management,2011.21 (3) :229 -238.
  • 6CIDA. The Logical Framework:Making IT Resuhsoriented[ M ]. TorontQ:Performance Review Branch, 1997.
  • 7OECD. DAC Guidelines and Reference Series, Quality Standards for Development Evaluation [ EB/OL].访问网址http://www.oeed.org.2012-12-29.
  • 8严启发,林罡.世界官方发展援助(ODA)比较研究[J].世界经济研究,2006(5):4-10. 被引量:15
  • 9Pinto. J K. ,Mantel S. J. Jr.. The causes of project failure[ J]. IEEE Transactions on Engineering Management. 1990, (37) :269 -276.
  • 10Diallo A. ,Thuillier D.. The success dimensions of international development projects:the perspectives of African project coordina- tors [ J ]. International Journal of Project Management, 2004, ( 22 ) : 19 - 31.

二级参考文献40

  • 1Chin W.W.The partial least square approach to structural equation modeling[M]//G.A.Marcoulides (Ed.).Modern Methods for Business Research.London:Lawrence Erlbaum Associates Publisher.1998.
  • 2Hair,J E,Anderson R E,Tatham R L,Black W C.Multivariate data analysis[M].Prentice Hall International Inc,Upper Saddle River,New Jersey,United States of America,1998.
  • 3Khang D B,Moe T L.Success criteria and factors for international development projects:a life-cycle-based framework[J].Project Management Journal,2008 (39):72-84.
  • 4Stockmann R.The sustainability of development projects:an impact assessment of German vocational-training projects in Latin America[J].World Development,1997 (25):767-784.
  • 5官方发展援助研究课题组.官方发展援助国际比较.海外投资与出口信贷,2006,(2):1-14.
  • 6Ahsan K,Gunawan I.Analysis of cost and schedule performance of international development projects[J].International Journal of Project Management,2010,28(1):68-78.
  • 7Crawford L,Pollack J,England D.Uncovering the trends in project management:journal emphases over the last 10 years[J].International Journal of Project Management,2006 (24):175-184.
  • 8CIDA.The logical framework:making it results-oriented[M].Toronto:Performance Review Branch,1997.
  • 9Baccarini D.The logical framework method for defining project success[J].Project Management Journal,1999 (30):25-32.
  • 10Coleman G.Logical framework approach to the monitoring and evaluation of agricultural and rural development projects[J].Project Appraisal,1987 (2):251-259.

共引文献79

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部